121104 01:35:57 - 121104 01:44:13
* starpoint_pole_bicep_summer.sch
* Not clear enough for an actual pointing. Just showing Chin Lin
how to run a pointing schedule
121103 22:54:09 - 121103 22:59:46
* do_cycle.sch
* Tilts:
az 0° 180°
x -9.157 -9.377
y 9.371 10.833
* dk=0
* cleaned GS, boot, UFB, window
* Membrane 0.15/0.5
* I investigated the much higher than usual vent gas recapture rates
in the previous two transfers. Found that Kathleen didn't completely
close the valve on tank 5. Pressure was slowly equalizing between
tanks 5 and 8. Measured contamination in 5, 6, 7, and 8 and they
appear clean. Flint will just have to top up tank 5 once we are done
with 8.
* Kathleen's Cryo Sitrep:
LHe:
Approximately
2800 liters of useable LHe remain in the Wessington dewars.
Approximately
500 liters of LHe were delivered to BICEP2.
Based
on a historical consumption rate of 35.7 liters/day, LHe
supplies are expected to be exhausted by January 2013
GHe:
Out of 16 storage tanks for gaseous
helium: 7 tanks are at 17.2 MPa (2500 psi), two tanks are at
13.8 MPa (2000 psi), one tank is at 12.4 MPa(1800 psi), one tank is at 10.3 MPa
(1500 psi), one tank is at 6.2 MPa (900 psi), one tank is at
2.8 MPa (400 psi), one tanks is at 1.0 MPa (150 psi), and two
tanks are at 0 MPa (0 psi).
Vent GHe from the LHe transfer was
compressed into the storage tanks.
LN2:
The
liquid nitrogen plant turned on 28 October 2012 and turned off
03 November 2012
Approximately
550 liters of LN2 are currently stockpiled on station.
Analysis/software/computers:
----------------------------
- Firewall crashed again today. Second time now. Will investigate.