Hi everyone,
We'll have a BICEP2 team meeting today (Tuesday) from 9-10 am Pacific.
Thanks to those who have sent reports for the listed analysis items.
Phone: 1-866-890-3820 (toll: 1-334-323-7229) Passcode:59702175
Notes in the Google doc for the meeting:
https://docs.google.com/document/d/1iVrfX19cXQr8fUgRYOUosshApHAIteOzir9REQA…
The Bispud pipeline telecon will follow immediately, run by Clem.
Except as listed below, all new analysis postings will be reviewed in
the pipeline telecon, not the main BICEP2 telecon.
Agenda below.
- Walt
-------------------------------------------------------------------------
23 Oct 2012 BICEP2 weekly telecon
1) Weekly report from Pole [ Steff ]
- Thermal test Oct. 16
-- how did it look?
2) Data quality / reduc czar report [ Jon ]
- Next week’s czar [ Jon ]
3) Testing and deployment planning
- Thermal testing [ Jon ]
- Deployment / measurement plan [ Colin, Randol ]
- FTS plan [ Zak ]
4) Analysis status reports
Baseline 2yr data reduction updates [ Walt ] brief!
- El nod goodness of fit cut: changes in progress [ Martin, Angiola ]
- offline NTD cal ready [ Walt ]
- tweak_elnods changes, need to reprocess a few tags [ Walt ]
http://bicep0.caltech.edu/~spuder/analysis_logbook/analysis/20121019_tweak_…
- new cutparams files, plot cuts pending [ Angiola ]
Characterizing non-beam systematics [ Walt / Angiola ] brief!
- relgain mismatch from per-channel abscal still in progress [ Walt ]
- crosstalk
- thermal
- magnetic: dark scan analysis [ Angiola ]
Characterizing beam systematics [ Abby (/Randol) ] brief!
Deprojection / beamsim algorithm coding status report [ Chris, Clem ]
* deproj sim test of linearity: add timestream noise
- Done. Shown to be linear (posting from last week)
http://bicep0.caltech.edu/~spuder/analysis_logbook/analysis/20121015_sim123…
* deproj sim test of beam width / ellipticity
- gen_templates mod in CVS to make templates for this
- Stefancurrently running sims
Data consistency check status report [ Chris (/Randol) ]
* B2 2-year deck jack maps cleaned up dramatically with deproj
http://bicep0.caltech.edu/~spuder/analysis_logbook/analysis/20121015_sim123…
* Comparison of recovered deproj coeffs w/ measured beams
- Randol has deproj coefficients
- In progress
* full jack chi2's, sum_bp_devs, etc.
- 50-realization simset now running on B2 2010+11 data.
Foregrounds status report: [ Jamie T ]
* PSM model for polarized dust and synchrotron ready for re-observing
with B2 pipeline.
* Emailed Jacques about whether PSM will include Planck
ERCSC...haven't heard back.
* We will probably have to run this as a separate catalogue and
compare to the PSM prediction.
* Will try this out first for B1.
Statistics for reporting bandpowers, r constraints [ Colin / John ]
* Current work: Posting in B1 analysis logbook:
http://bicep0.caltech.edu/~bicep/analysis_logbook_north/20121019_toy_model
- compare method in toy model: direct calc, quadratic estimator,
offset-lognormal, Hamimeche-Lewis
- offset-lognormal method not a good match
* Planned work:
- Immanual to extend “toy model” to include:
- freq cross spectra, TE cross spectrum, E->B leakage.
- Colin refining rho statistic (quadratic estimator)
* Eventual goal
- Use Hamimeche-Lewis for bandpower likelihoods
(CosmoMC compatible)
- Use quadratic estimator rho for limits on r
- Use H-L bandpower likelihoods for 95% CL BB band powers