Thanksgiving notes, Saturday November 24th.
Today
-Finished the last of 5 RPS schedules today! So we got all dk angles observed with the RPS
on Keck.
-RX3 and RX4 continue to warm up on the mount, on track to be warm on Monday.
-Took the far field flat off this morning! Yahoo.
-RX0,RX1,RX2 are cooling back down and are all ~4K
-RPS taken down off DSL mast and in Mapo lab now.
-FTS arrived and is in DNF
-The uber chopper stopped spinning two days ago. When we took it apart it was clear that
the gears inside the motor are messed up. The problem feels mechanical not electrical when
you spin the shaft by hand. We have a spare, but
Tomorrow(Sunday)
-Take it easy a bit
-Continue to warm up, remove back side electronics
-Put RPS up for BICEP2 to observe.
Monday
-Take the two cryostats off the mount
-Begin to take cryostats apart
-----Original Message-----
From: keckarray-bounces(a)lists.stanford.edu on behalf of Colin Bischoff
Sent: Fri 11/23/2012 12:28 PM
To: Keck Array; BICEP2 group
Subject: [keckarray] South Pole notes, 2012-11-23
hi all,
We have been progressing well on that schedule that Zak sent around a
couple of days ago. We have been keeping the observation logbook up to
date (and it should be rsyncing to North America) so check it for details:
http://spud.spa.umn.edu/~keckdata/keckdaq_obs_logbook.html
* Last night, we shut off the compressors for rx3 and rx4. This was done
in series, so that we could check them both for He3 using the RGA. Both
tests came out negative, which is good. Rx3 seemed to have a
significantly worse vacuum, but that might have been due to small leaks
in our vacuum hose system.
* We are currently running the last of the five Keck RPS schedules,
expecting to finish Saturday morning. This schedule has rx1 centered at
the back of the mirror, with some mirror coverage for rx0 and rx2.
* Saturday - Take off the Keck ffflat, with help from Jon Kaufman and
Steele. Take down the RPS from the DSL mast and move it to the MAPO mast
for B2 calibrations.
* Sunday - Recover from Thanksgiving. Remove back-end electronics from
rx3, rx4. If necessary, finish setting up the RPS for B2.
* Monday - Take rx3, rx4 out of the mount and start disassembly.
* Tuesday - Finish rx3, rx4 disassembly.
* Wednesday - Grant and Howard remove the one good tile that we plan to
keep at pole for potential installation into the rx1 focal plane.
* Thursday - Zak leaves, hand carrying two FPUs.
-colin