South Pole notes, 2012-12-11
by Bischoff, Colin (Guest)
hi all,
We had some good progress over the weekend.
[Thursday / Friday]
* Finished the fiducial set of four dk angles for BICEP2 RPS observations.
* Ran a schedule to repeat the RPS observation for one row of detectors at a single dk angle three times in a row.
* Deliberately misaligned the RPS by 15 degrees in azimuth and repeated the same row of detectors three more times.
* Took down the RPS, put up the uberchopper, and ran unpolarized beam maps at dk=+-45.
[Saturday]
* Immanuel arrived.
* Bench tests of the rotating polarized source, to look for collimation offset and beam ellipticity.
* Put the RPS back up, but with the wire grid set to horizontal alignment to run pixel pol raster schedules (RPS orientation fixed, rotate BICEP2 in dk to map out the detector angles).
[Sunday]
* Fixed an azimuth offset in our pixel pol rasters, so now we are actually hitting the source. Continued running this schedule through Sunday night. We should have data for 30 rgl pairs spread across the four tiles.
[Monday]
* Took off the BICEP2 far field flat!
* Ran yukical on BICEP2.
* More bench tests of the RPS -- looking at stability of the power output.
* Set up source for BICEP2 sidelobe mapping. First sidelobe map is at very low source power -- chop amplitude is only 1000 ADU for a co-polar detector. (not dubstepping the detectors)
Also, during this span of time, cooled down K5 in MAPO with just the camera installed (but no detectors, obviously), to observe whether the bellows contraction is significantly different than when the cryostat is simply under vacuum.
I have started transferring some arc files from Keck RPS observations. These are going through the usual route, so I think they should make it to spud / odyssey automatically. Can someone check to see if there are any Keck arc files on odyssey from late on November 15 to early November 16?
[Plan for today]
* Finish RPS bench tests -- last test we want to run is to observe the source power output while we let it cool down outside.
* Repackage BBNS from RPS to use for Keck sidelobe mapping. Set up source for Keck sidelobe maps.
* Keep moving along with BICEP2 sidelobe map itinerary.
[Rest of the week]
* BICEP2 sidelobe mapping will take us through to Thursday morning at least, but there are additional sidelobe schedules that we would run if more time is available.
* Chin Lin and Colin are leaving on Saturday. I'm hoping to get BICEP2 out of the mount and into the lab stand before I leave, which means Friday at the latest. Seems to imply that we could continue sidelobe mapping through Thursday (either one more source configuration, or maybe just contingency in case something gets screwed up).
* Plenty of Keck sidelobe mapping to do, since we don't really have any useful sidelobe data from previous summers. Is there a particular date when we should cut this off to take down rx1?