Dear Group,
Facilities stopped by to inform us that they will be doing construction in
M109 and M110 for the next 2 weeks. They are replacing the pipes above so
it will be loud. Although they will be putting down plastic to protect the
area, you may want to safeguard your equipment from any debris that might
fall.
Thanks,
Anna
--
Anna B. Shin
Aspuru-Guzik Group Administrator
Department of Chemistry and Chemical Biology
Harvard University
12 Oxford Street
Cambridge, MA 02138
617.496.9964 phone
617.496.9411 fax
shin(a)chemistry.harvard.edu
Aspuru-Guzik Group URL:
http://aspuru.chem.harvard.edu/